The following LSPA compliance tip was presented at the November 2020 Membership Meeting, which was held virtually through the Zoom webinar platform, on November 18, 2020.
Compliance Tip
A Comprehensive Remedial Alternative that would achieve a Permanent Solution is considered feasible unless: (a) the alternative is not technologically feasible; or (b) the costs of conducting, or the risks resulting from, the alternative would not be justified as determined by a benefit-cost analysis; or three other considerations as outlined in 310 CMR 40.0860 (5).
Click here to view all published compliance tips. This document is also posted in the Members Only section of the website under Technical Resources.