LSPA Unveils April Compliance Tip of the Month

The LSPA presented the following compliance tip at the April Membership Meeting held at the Holiday Inn in Taunton, MA on April 24, 2018. 

Remediation Waste (e.g., contaminated soil or debris excavated from a site or groundwater collected for disposal) should be removed from a site within 120 days of its initial excavation or collection. If the LSP anticipates the waste remaining on site for more than 120 days, (s)he can submit a RAM or IRA Plan or Phase IV RIP to MassDEP outlining a specific plan and schedule for dealing with the waste beyond the 120-day deadline.   
Don't forget that remediation waste does not include hazardous waste, which must be removed within 90 days.  310 CMR 40.0031(7)

Click here to view all published compliance tips. This document is also posted in the Members Only section of the website under Technical Resources.

Share this post:

Comments on "LSPA Unveils April Compliance Tip of the Month"

Comments 0-5 of 0

Please login to comment